| |
|
|
|
Since 2002,
NCC has been relocated itself as a main steel structure supplier for petrochemi-cal
plant, Power plant, Equipments etc.
Why did NCC top management make such a decision? Of course No.1 is this
market very demanding; No.2 is that NCC advantages in doing this business
are much more than the compe-titors: |
| 一、Latest version Xsteel for detail drawings. |
 |
1、NCC has 20 Xsteel Engineers.
2、More than 5 years Experiences for international projects.
3、No matter how complicated the joints are, pre-assembly in computer
is to ensure zero erection mistakes on site. |
|
| 二、Latest RH line. |
1、800t/month for hot rolled shape fabrication.
2、NCC is going to buy another RH line from Japan to double the capacity
to 1600t/month. |
 |
|
|
|
| 四、Performance |
| 1、JGC (4500t pipe racks, shelters). On 18th,Nov,2004.
NCC was awarded:"LOP Project Appreciation Certificate"
from JGC Corporation. |
 |
 |
 |
 |
 |
 |
|
| 2、Sumitomo (4500t power plant steel boilers, coal
bunkers, etc). |
 |
 |
 |
 |
|
| 3、Unitex (1500t Furnace, Tin Bath steel). |
 |
 |
 |
 |
| 4、xiamen xianglu PTA CTCI(3000t). |
 |
|
| 五、Customers evaluations: |
1、Timely delivery, very good after-sales
service.
2、Excellent fabrication zero erection mistakes.
|
|